SIMM Inspection Job Sheet

Structural Inspection and Maintenance Management

Client logo placeholder

Inspection Details

Inspection Date
2023-11-15
Inspector
John Doe
Accompanied By
John Doe
Document No
SIMM-JS-2023-001
Project
North Pit – Sector 4 Conveyor Upgrade
Client / Site
Tronox

Observations and Findings

Reference
REF-7821
Action Type
Structural Repair
Item Description
Main support beam for conveyor CV-04
Functional Location
Conveyor Support - CV-04-SUP-02
Category
Priority
Condition Description

Visible corrosion on lower flange with ~15% material loss. Surface pitting along entire length.

Required Action

Clean exposed rebar; apply corrosion protection; use wet-to-dry epoxy; reinstate with concrete repair. Complete within next 12 months to limit further degradation.

Photo Documentation

Photo 1
Fig 1: Ref 1.1 – Concrete spalling (example)
Photo 2
#1.2 [C3, P3] Moderate Corrosion
Fig 2: Ref 1.2 – Walkway corrosion (example)